Proposed Data Center Project
A proposed strategic 50-acre data center to serve local and multinational clients.
- Introduction The proposed data center will be a state-of-the-art facility designed to support high-performance computing, cloud storage, and enterprise-grade IT solutions. Situated on a 50-acre site, the data center will incorporate cutting-edge infrastructure to meet the growing demands for data processing, storage, and security.
- Objectives
- Establish a secure, scalable, and energy-efficient data center.
- Support enterprise and government clients with high-availability services.
- Implement advanced cybersecurity measures.
- Ensure compliance with industry regulations and standards.
- Promote sustainability through green energy solutions.
- Key Features
- Facility Specifications:
- 500,000+ square feet of floor space.
- Tier IV data center classification for maximum uptime.
- Modular and scalable architecture.
- Power & Cooling:
- Dual power sources with on-site renewable energy integration (solar, wind, or hydro).
- Advanced cooling systems (liquid cooling, direct-to-chip cooling, free-air cooling).
- Redundant UPS and backup generators.
- Network & Connectivity:
- Multi-terabit fiber-optic backbone.
- Carrier-neutral facility with multiple ISPs.
- Direct peering with cloud service providers.
- Security & Compliance:
- 24/7 surveillance with biometric and multi-layered access control.
- Fire suppression systems (gas-based and water mist).
- Compliance with SOC 2, ISO 27001, and GDPR.
- Disaster Recovery & Business Continuity:
- Geographic redundancy and off-site backup capabilities.
- Automated failover systems.
- Sustainability Initiatives:
- Energy-efficient data center design with a PUE below 1.3.
- Use of sustainable construction materials and smart energy management.
- Water recycling and rainwater harvesting for cooling systems.
- Budget Estimate
Component | Estimated Cost (USD) |
Land Acquisition (50 acres) | $10M |
Construction & Infrastructure | $200M |
Power & Cooling Systems | $50M |
Network & Connectivity | $30M |
Security & Compliance | $20M |
Renewable Energy Setup | $40M |
Operations & Staffing | $15M |
Contingency & Miscellaneous | $10M |
Total Estimated Budget | $375M |
- Implementation Timeline
- Phase 1 (0-6 months): Land acquisition, design, and regulatory approvals.
- Phase 2 (6-18 months): Construction and infrastructure setup.
- Phase 3 (18-24 months): Equipment installation and testing.
- Phase 4 (24+ months): Full operational launch and client onboarding.
6. Conclusion This data center will be a critical asset in supporting digital transformation, providing secure, high-performance computing environments for enterprises and government agencies. With a focus on sustainability, efficiency, and resilience, the project will position itself as a leader in the data center industry.